Srinagar, April 21 -- The Chief Engineer, Distribution, Kashmir Power Distribution Corporation Limited (KPDCL), has announced a series of power shutdowns in parts of Srinagar, South Kashmir and Baramulla due to maintenance works on various 33 KV lines.

Power supply to Jamallata, Nawa Bazar, Zaina Kadal, Zal Dagar, Nowhatta, Nawa Kadal, Maharaj Gunj, Kaka Sarai, Maidanpora, SMHS Hospital and adjoining areas will remain affected from 3 pm to 5 pm on April 21 due to shutdown of the 33 KV Wanganpora-SHPora line.

Power supply to Shamsipora and adjoining areas will remain affected from 9 am to 4 pm on April 23 and April 27 due to shutdown of the 33 KV Shamsipora Tap line.

Similarly, power supply to Qaimoh, Rampora, Mathalhama, Rahpora, Redwa...