India, July 30 -- The Government of India has issued a release:
Reactors
Project Cost (Rupees in Crores)
220 MWe Bharat Small Modular Reactor (BSMR-200)
5960
Twin Unit of 55 MWe Small Modular Reactor
7000
High Temperature Gas Cooled Reactor (HTGCR) having capacity up to 5 MWth
320
(SMR-55)
The Government has drawn up a roadmap for reaching the 100 GW nuclear power capacity in the next two decades i.e. by 2047, as announced in the Nuclear Energy Mission in the Union Budget 2025-26, thereby increasing the share of reliable, low-carbon base-load nuclear energy in the country's energy mix and supporting the vision of Viksit Bharat and the goal of Net Zero carbon emissions by 2070.
The roa...