MUMBAI, India, May 29 -- Intellectual Property India has published a patent application (202641044133 A) filed by Saveetha Institute Of Medical And Technical Sciences, Chennai, Tamil Nadu, on April 7, for 'cognitive triggered physiotherapy safety system using eye tracking and reflex delay analysis.'

Inventor(s) include Dr. Pavithra S; Srihan M; and Deepak Nallaswamy Veeraiyan.

The application for the patent was published on May 29, under issue no. 22/2026.

According to the abstract released by the Intellectual Property India: "The present invention relates to an intelligent physiotherapy safety monitoring system designed to assess cognitive readiness and prevent injury during therapeutic exercise and rehabilitation. The system utilizes a...