HC raps BMC's 'shifting stands' on old SoBo bldg
MUMBAI, Dec. 10 -- The Bombay High Court on Monday strongly criticised the Brihanmumbai Municipal Corporation (BMC) for repeatedly changing its stance on the structural condition of a South Mumbai building near the Opera House. The court directed the civic body to explain its position, review the building's status thoroughly, and take a stand that is justified by official records.
The dispute centres around the Mehta Mahal Commercial Cooperative Premises Society, a 13-storey commercial building in Charni Road. A technical advisory committee (TAC) set up by the BMC in 2021 conducted a structural audit of the building and categorised it as 'C2B', meaning repairs were required but evicting the building's residents was not necessary. Acting on this report, the BMC directed the society to urgently carry out the repairs.
However, since Mehta Mahal is located in a densely populated area of South Mumbai and houses several offices and commercial establishments, concerns about the building's safety became a subject of litigation among the owners, occupants and the civic body.
In 2023, one of the building's owners, approached the high court, claiming the building was in a dangerous condition and needed to be demolished.
Following this, the court in September 2023 observed, "It is difficult to see how a repair permission granted by the BMC on the basis of a TAC report can now be short-circuited by producing yet another report". By 2024, the society informed the court that 70% of the repair work had already been completed, and told the court that the building's demolition was unnecessary.
Despite this, in April 2024, the BMC classified the building as 'C1', a category reserved for structures requiring evacuation and demolition. The legal back and forth continued as one of the building owners filed a petition in the Supreme Court claiming that the civic body had failed to inform the high court about the new 'C1' classification. The Supreme Court dismissed the petition in May and directed the court to sort out the matter soon.
On Monday, a division bench of justices Ravindra Ghuge and Ashwin Bhobe noted that the civic body had initially relied on the TAC report to categorise the building as 'C2B', but later classified it as a 'C1' structure requiring eviction and demolition.
The BMC's assistant commissioner then informed the court that the 'C1' classification was a result of miscommunication, and the building had now been re-classified as C2.
Taking note of the civic body's "shifting stands", the court directed the BMC to "carefully go through the entire file of the property and take a stand in such a manner as the records may justify"....
To read the full article or to get the complete feed from this publication, please
Contact Us.