GMDA to inspect rainwater harvest systems in 166 housing societies
Gurugram, Aug. 14 -- The Gurugram Metropolitan Development Authority (GMDA) has decided to check the functioning of rainwater harvesting (RWH) systems installed in 166 residential societies in the city, which have been developed in 20 residential sectors. The directions were issued by principal advisor, urban development Haryana government, DS Dhesi to GMDA officials, said officials familiar with the matter.
Officials said that this direction comes in the wake of a draft drainage report submitted by a GMDA consultant in July end, which said that around 50 percent condominiums had non-functional RWH systems. A senior GMDA official said that a meeting was held on August 6 under the chairmanship of Dhesi regarding heavy waterlogging on main roads during monsoon.
During the meeting, Dhesi issued instructions to GMDA officials to check the RWH systems built in residential societies and colonies. It has been directed that the faulty RWH structures should be repaired and if missing, then it should be constructed according to the approved building plans of these projects, said the senior GMDA official. RS Bhath, district town planner, GMDA said that they have identified residential sectors which have group housing projects and cooperative housing projects approved by the Haryana Shehri Vikas Pradhikaran (HSVP)."It has been directed by the principal advisor that RWH systems in condominiums and group housing projects should be made functional as this will prevent waterlogging across the city. We have asked resident welfare associations (RWAs) of 166 societies to inform the authority regarding the number of RWH pits in the society, year of construction and capacity of these systems to absorb rainwater," said Bhath.
As per the authority, the maximum number of 87 residential group housing societies allotted by HSVP are in sectors 55 and 56. These residential societies are developed in an area ranging from one acre to three acres. There are 16 residential societies in Sector 47.
According to the rules of HSVP and town and country planning department, rainwater harvesting is mandatory in houses built in an area of more than 100 square meters.
"A considerable amount of rainwater can be harnessed if RWH systems are functional. We will also ensure that internal drainage systems of these condominiums are linked to the master drainage network of the authority," said Bhath, adding that they have given a week's time to the RWAs to submit information.
Another GMDA official said that letters seeking details have been written to RWAs of residential societies developed in sectors 15, 24, 26, 26A, 27, 28, 42, 43, 45, 46, 47, and sectors 49 to 57.
RK Yadav, president, sector 46 RWA said, "In the very first monsoon rain, the RWH structures get choked as mud lying on the road seeps. Unless roads are not cleaned, RWH is not going to work."...
To read the full article or to get the complete feed from this publication, please
Contact Us.