Prayagraj waterlogging woes set to end with drainage overhaul
PRAYAGRAJ, Oct. 24 -- The city is set for a comprehensive revamp of its drainage system with a proposed investment of around Rs.1,500 crore. The initiative has been launched following strict directions from the Allahabad high court and aims to provide a permanent solution to flooding of roads, colonies and residential areas.
As part of groundwork for the project, a city-wide drone survey is currently underway to identify waterlogging-prone zones, assess the condition of existing drains and detect obstructions that hinder stormwater flow.
The survey is expected to be completed by December, after which a detailed drainage master plan will be prepared.
The Prayagraj Municipal Corporation has entrusted the task to Construction and Design S...
Click here to read full article from source
इस लेख के रीप्रिंट को खरीदने या इस प्रकाशन का पूरा फ़ीड प्राप्त करने के लिए, कृपया
हमे संपर्क करें.