CR dismantles Parel FOB staircase for fifth and sixth lines, commuters face longer walks
India, Nov. 26 -- Thousands of commuters using Parel and Prabhadevi stations are having to take the congested foot overbridge (FOB) where the Elphinstone Road stampede occurred on September 29, 2017, killing 23 people and injuring 39 others, after Central Railway (CR) shut one of the busiest pedestrian connections between the two stations around 7-10 days ago. The staircase connecting the east side of Parel station to the road outside has been blocked with metal sheets, with workers now dismantling portions of the structure to make way for the proposed fifth and sixth railway lines between Kurla and Parel.
The six-metre-wide FOB, among the widest in this stretch, was built in 2023 to ease the growing commuter congestion at Parel and Prab...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.