Exclusive

Publication

Byline

M/S ROMAN ENTERPRISE secures contract for 1. Construction of RCC Road Start from Lonshing Math Gourango Road to Wasuddin Sardar House. (Ch. 00m-450m), Link-1: Chaiyal Bari Road. (Ch. 00m-110m), Link-2: Sarder Bari Road. (Ch. 00m-120m), at Ward no. 06 & 09, Under Naria Paurashava, District::Shariatpur. Total Length: 680.0m. 1. Construction of RCC Road Start from Lunaria Chaldha main road to Dighirpar Madrasha Road. (Ch. 00m-590m). & Link: Mazhi Bari Road. (Ch. 00m-110m) at Ward no. 07, Under Naria Paurashava, District: Shariatpur. Total Length: 700.0m. (Salvage Tk-58,910.00).

Bangladesh, Aug. 10 -- Bangladesh based M/S ROMAN ENTERPRISE has secured contract from Local Government Engineering Department (LGED) for 1. Construction of RCC Road Start from Lonshing Math Gourango ... Read More


MKL AROHI JV (Joint Venture) secures contract for (a)Improvement of Ali Bazar - Jorkhali Road (Ch. 00m-745m), ID no: 475364075 (b)Improvement of Islampur Bazar - Adarsha Gram - Jorkhali Road (Ch. 00m-770m), ID no: 475364076 (c)Improvement of Nabipur Bazar - HBB Road- Hatia Bazar Road (Ch. 00m-381m) under Hatiya Upazila, District: Noakhali, ID no: 475364077

Bangladesh, Aug. 10 -- Bangladesh based MKL AROHI JV (Joint Venture) has secured contract from Local Government Engineering Department (LGED) for (a)Improvement of Ali Bazar - Jorkhali Road (Ch. 00m-7... Read More


M/S Kazi Mahabubur Rahman secures contract for a) Improvement of Ramkantapur CARE Bridge-Mathabanga Rd (Ch: 2512-3600m) by BC Road ID No: 255855062. b) Improvement of Singra-Semakhali Road at Chandra Momrez House to Mott Road (Ch: 00m-1115m) Road ID: 255855162.(Salvage Amount: 41,836.00 Tk.) c) Improvement of Thoipara Bazar-Subash Dottor House via Robin Biswas House Rd (Ch: 00m-880m) by BC Road ID: 255855227 (Salvage Amount: 8,10,730.00 Tk.) under Salikha Upazila, Dist: Magura.

Bangladesh, Aug. 10 -- Bangladesh based M/S Kazi Mahabubur Rahman has secured contract from Local Government Engineering Department (LGED) for a) Improvement of Ramkantapur CARE Bridge-Mathabanga Rd (... Read More


YPERO S.A. secures contract for Car park building construction work - Design and construction of a transfer hub in Kalisz at ul. Zlota/Majkowska

Poland, Aug. 10 -- Poland based YPERO S.A. has secured contract from Krajowa Izba Odwolawcza for Car park building construction work - Design and construction of a transfer hub in Kalisz at ul. Zlota/... Read More


MARCO.INTERNATIONAL secures contract for Construction of extension existing Truck Yard & ancillary works at lagoon area in GPFPLC, Polash, Narsingdi.

Bangladesh, Aug. 10 -- Bangladesh based MARCO.INTERNATIONAL has secured contract from Bangladesh Chemical Industries Corporation (BCIC) for Construction of extension existing Truck Yard & ancillary wo... Read More


M/S. Chandradwip Construction secures contract for Hessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or latest. 1. Bag Length: 86.36cm/34 inch, Tolerance: +4cm -0; 2. Bag width: 45.72cm/18 inch, Tolerance: +4cm -0; 3. Bag weight: 330gm/0.73 Pound, Tolerance: +6 percent, -2 percent; 4. Ex-Cloth: 36inch-10.8 oz/36inch (11x12) {WIP (Weight in proportion) 40 inch-12 oz/36 inch (11x12)}; 5. Porter (Ends/dm): 11(47), Tolerance: +2, -2; 6. Shots/Ins (Picks/dm): 12(47), Tolerance: +2, -2; 7. Moisture Regain (MR Percent): Contract 16 percent, Maximum 17 percent; 8. Oil Content: 3 percent Maximum, 9. Sewn: Hemmed Mouth, Herackle Sewn (HKL) Side & Bottom+Safety Sewn; 10. Stitch/dm: Hemming 9-11, Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 lbs 1 Ply, Herackle 9 lbs 3 Ply & Safety 9 lbs 2 Ply; 12. Strength (Kg): a. Cloth breaking load (Strip method 10x20cm): Warp Way- 112 kg (minimum), Weft Way- 120 kg (minimum), b. Seam breaking load (Strip method 5x20cm): Warp Way- 34 kg (minimum), Weft Way- 36 kg (minimum); 13. No. of Bag per Bundle: 25 Pcs, Tolerance: +0, -0; 14. No. of Bundle per Bale: 12 Bundle, Tolerance: +0, -0; 15. No. of Bag per Bale: 300 Pcs, Tolerance: +0, -0; 16. Bale Weight: Net Weight=99 kg, Tolerance: +Acceptable,-0, Tare Weight=3kg, Gross Weight =102 kg; 17. Bale Packing: Flat Packing, Bags Wrap in Clean Jute Cloth and Binded with 2(Two) Iron Belt.(BIRGANJ LSD, DINAJPUR-1,50,000, SETABGANJ LSD, DINAJPUR-2,50,000 PCS.).

Bangladesh, Aug. 10 -- Bangladesh based M/S. Chandradwip Construction has secured contract from Directorate General of Food for Hessian New Gunnies with 30 kg packing capacity manufactured in the year... Read More


M/S Shaid Traders secures contract for (a) Improvement of Haripur-Gungur Nadi Road at Ch: 1350-2000m (Road ID: 419185001) , (b) Construction of 137m Protective Work on the same road, (b) Improvement of Burichang B-Para R&H-Jagatpur Sadar uddin Hazi House via Taher Dr. House Road at Ch: 300-1800m (Road ID: 419184099) (Salvage materials cost Tk. 18,71,340/-), , (b) Construction of 215m Protective Work on the same road under Burichong Upazila, District: Cumilla

Bangladesh, Aug. 10 -- Bangladesh based M/S Shaid Traders has secured contract from Local Government Engineering Department (LGED) for (a) Improvement of Haripur-Gungur Nadi Road at Ch: 1350-2000m (Ro... Read More


Md. Abdul Hakim Kaligonj Satkhira secures contract for Part-1: Improvement of Datinkhali Chairman More - Dipaon High School Road from Ch: 00-1000m (Road ID: 287865335) (Effective Length=1000m) Part-2: Improvement of Bonbibi Tola GPS - Kadomtola GPS Road from Ch: 00-1480m (Road ID: 287865337) (Effective Length=1480m) under Shyamnagar Upazila, Dist: Satkhira. (Total Effective Length=2480m) Salvage Materials Cost BDT. 1606617.00

Bangladesh, Aug. 10 -- Bangladesh based Md. Abdul Hakim Kaligonj Satkhira has secured contract from Local Government Engineering Department (LGED) for Part-1: Improvement of Datinkhali Chairman More -... Read More


M/S. Mohshin & Brothers secures contract for Construction of shaded store yard, underground water reservoir with pump house including installation of deep tube well at Lohagora Zonal office complex under Chattogram PBS-1.

Bangladesh, Aug. 10 -- Bangladesh based M/S. Mohshin & Brothers has secured contract from Rural Electrification Board (REB) for Construction of shaded store yard, underground water reservoir with pump... Read More


MC Systems & Services s.r.o. secures contract for Access control system - "EISLER'S COLLEGE - REPLACEMENT OF COMPLETE ELECTRICAL INSTALLATION, RECONSTRUCTION OF FLOORS AND SUPPLY OF ACCESS SYSTEM and THALER'S COLLEGE - RECONSTRUCTION OF FLOORS, FIRE DOORS, DELIVERY OF ACCESS SYSTEM - access system"

Czechia, Aug. 10 -- Czechia based MC Systems & Services s.r.o. has secured contract from Vysoka skola ekonomicka v Praze for Access control system - "EISLER'S COLLEGE - REPLACEMENT OF COMPLETE ELE... Read More