Exclusive

Publication

Byline

SUDOP PRAHA a.s. secures contract for Engineering design services for the construction of civil engineering works - Construction of the marshalling station Doubravka and I/20 Plzen, Jatecni - Na Roudne

Czechia, Aug. 10 -- Czechia based SUDOP PRAHA a.s. has secured contract from Sprava zeleznic, statni organizace for Engineering design services for the construction of civil engineering works - Constr... Read More


Water Birds Limited secures contract for Connection with Construction of 04 nos Mini Piped Water Supply Scheme under Host and Rohingya Enhancement of lives (HELP project, DPHE part) at Hatia Upazila in Noakhali District. FY 2025-2026.

Bangladesh, Aug. 10 -- Bangladesh based Water Birds Limited has secured contract from Department of Public Health Engineering (DPHE) for Connection with Construction of 04 nos Mini Piped Water Supply ... Read More


Techbay International secures contract for 2.054 Km River Bank Protection Work on the Bank of Selonia River of Feni Sadar and Fulgazi upazila in Feni District under the project of Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project (B-STRONG) (BWDB Part)

Bangladesh, Aug. 10 -- Bangladesh based Techbay International has secured contract from Bangladesh Water Development Board (BWDB) for 2.054 Km River Bank Protection Work on the Bank of Selonia River o... Read More


MITHO ENTERPRISE secures contract for 1. Construction of RCC drain & footpath at auchpara saffiuddin sarkar academy road. 2. Improvement of RCC road from auchpara Beximco to last portion of karima begum house. 3. Improvement of RCC road from auchpara noimuddin molla road to bluesoom school to khapara and moktarbari execllent school & college to abu ahmed house via saffiuddin academy road. 4. Construction of RCC Drain from auchpara noimuddin molla road bluesoom school to khapara and moktarbari execllent school & college to abu ahmed house via saffiuddin academy road. 5. Construction of RCC Road from tongi pubail jonokhabar hotel to dulal garage via modumita road. 6. Improvement of RCC Road from Masimpur Rahman house to Hayat house and Masimpur Ajom khan house to Gafariya madrasa via Khalek house Titas road to Hafis Uddin bepari road. 7. Construction of RCC road from Titas Gas Road to Masimpur Mosque. 8. Improvement of BC/RCC road from Mirashpara Amtoli to Dhaka dying via Alertek. 9. Construction of RCC road from Besic water pump to Mirashpara amtoli. 10. Construction of RCC Drain from Besic water pump to Mirashpara Amtoli. 11. Construction of RCC road from end point of Nodi Bander raod to River. 12. Construction of RCC Drain from end point of Nodi Bander raod to River. 13. Improvement of RCC road from TNT road to Gopalpur Connecting road and Freedom Fighter Samsul Haq house to Pentagoan Fashion.

Bangladesh, Aug. 10 -- Bangladesh based MITHO ENTERPRISE has secured contract from Gazipur City Corporation for 1. Construction of RCC drain & footpath at auchpara saffiuddin sarkar academy road. 2. I... Read More


S. A Khan Corporation secures contract for (i) Construction of Lab cum Functional Building with Training complex at OFRD,BARI, Khulna & OFRD, BARI, Pabna. (5 Storied Building) (ii) Installation of 200 KVA Electrical Sub-station at OFRD,BARI, Khulna.

Bangladesh, Aug. 10 -- Bangladesh based S. A Khan Corporation has secured contract from Bangladesh Agricultural Research Institute for (i) Construction of Lab cum Functional Building with Training com... Read More


MD. MOYENUDDIN (BASHI) LIMITED secures contract for Periodic Maintenance Programme PMP (Major-Road) for Establishment of Ferry Ghat at Sannyasi End and Construction of Flexible Pavement from Pollimongol Bazar (Crossing point with R-773) to Sannyasi Ferry Ghat (Ch. 0+000 to Ch. 7+000 = 7.000 Km) as Connecting Road of Proposed Kolaron (Indurkani, Pirojpur)- Sannyasi (Morelgonj, Bagerhat) Ferry Ghat under Road Division Bagerhat during the year 2025-2026.

Bangladesh, Aug. 10 -- Bangladesh based MD. MOYENUDDIN (BASHI) LIMITED has secured contract from Roads & Highways Department (RHD) for Periodic Maintenance Programme PMP (Major-Road) for Establishment... Read More


Delta Engineers & Consortium Ltd. secures contract for Construction of 10-Storied Residential Flat Building at Abandoned House No-66/A2, Nasirabad Housing Society,Chattogram including Civil, Sanitary, LP Gas Connection, Arboriculture, Boundary Wall, Sewage Treatment Plant, Internal Electrification etc.under the Project titled as Construction of Residential Flat for Government Officers/Staffs at 36 nos Abandoned House in Chattogram City.

Bangladesh, Aug. 10 -- Bangladesh based Delta Engineers & Consortium Ltd. has secured contract from Public Works Department (PWD) for Construction of 10-Storied Residential Flat Building at Abandoned ... Read More


MD. MOYENUDDIN (BASHI) LIMITED secures contract for Widening (Partial), Strengthening (Partial), Surfacing and Protective work (Damaged Portion) from Ch. 0+00 km (Togra More) to Ch. 17+345 km (Synnashi Kheya Ghat) of Togra-Zianagar-BaliPara-Kalaron-Synashi Road (Z-7711) Under Pirojpur Road Division during the year 2025-2026.

Bangladesh, Aug. 10 -- Bangladesh based MD. MOYENUDDIN (BASHI) LIMITED has secured contract from Roads & Highways Department (RHD) for Widening (Partial), Strengthening (Partial), Surfacing and Protec... Read More


Campus Codeworks Zartkoruen Mukodo Reszvenytarsasag secures contract for Software-related services - TF-NEPTUN tracking, support and link service

Hungary, Aug. 10 -- Hungary based Campus Codeworks Zartkoruen Mukodo Reszvenytarsasag has secured contract from Magyar Testnevelesi es Sporttudomanyi Egyetem for Software-related services - TF-NEPTUN ... Read More


Nabarun Traders Limited secures contract for Dredging Work of Kachalong River from Km. 63.150 to Km. 67+000 = 3.850 Km under Rangamati WD Division, BWDB, Kaptai.

Bangladesh, Aug. 10 -- Bangladesh based Nabarun Traders Limited has secured contract from Bangladesh Water Development Board (BWDB) for Dredging Work of Kachalong River from Km. 63.150 to Km. 67+000 =... Read More