Exclusive

Publication

Byline

VJP CONSTRUCTION & SUPPLY secures contract for 26NH0025 - Concreting of Barangay Road at Umbay, (0+000 - 1+678), Tago, Surigao del Sur

Philippines, Aug. 10 -- Philippines based VJP CONSTRUCTION & SUPPLY has secured contract from DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SURIGAO DEL SUR 1ST DEO for 26NH0025 - Concreting of Baranga... Read More


Bengal Jute Industry secures contract for Hessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or latest. 1. Bag Length: 86.36cm/34 inch, Tolerance: +4cm -0; 2. Bag width: 45.72cm/18 inch, Tolerance: +4cm -0; 3. Bag weight: 330gm/0.73 Pound, Tolerance: +6 percent, -2 percent; 4. Ex-Cloth: 36inch-10.8 oz/36inch (11x12) {WIP (Weight in proportion) 40 inch-12 oz/36 inch (11x12)}; 5. Porter (Ends/dm): 11(47), Tolerance: +2, -2; 6. Shots/Ins (Picks/dm): 12(47), Tolerance: +2, -2; 7. Moisture Regain (MR Percent): Contract 16 percent, Maximum 17 percent; 8. Oil Content: 3 percent Maximum, 9. Sewn: Hemmed Mouth, Herackle Sewn (HKL) Side & Bottom+Safety Sewn; 10. Stitch/dm: Hemming 9-11, Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 lbs 1 Ply, Herackle 9 lbs 3 Ply & Safety 9 lbs 2 Ply; 12. Strength (Kg): a. Cloth breaking load (Strip method 10x20cm): Warp Way- 112 kg (minimum), Weft Way- 120 kg (minimum), b. Seam breaking load (Strip method 5x20cm): Warp Way- 34 kg (minimum), Weft Way- 36 kg (minimum); 13. No. of Bag per Bundle: 25 Pcs, Tolerance: +0, -0; 14. No. of Bundle per Bale: 12 Bundle, Tolerance: +0, -0; 15. No. of Bag per Bale: 300 Pcs, Tolerance: +0, -0; 16. Bale Weight: Net Weight=99 kg, Tolerance: +Acceptable,-0, Tare Weight=3kg, Gross Weight =102 kg; 17. Bale Packing: Flat Packing, Bags Wrap in Clean Jute Cloth and Binded with 2(Two) Iron Belt.(KUSHTIA SADAR LSD, KUSHTIA-4,00,000 PCS.).

Bangladesh, Aug. 10 -- Bangladesh based Bengal Jute Industry has secured contract from Directorate General of Food for Hessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or ... Read More


STRABAG a.s. secures contract for Construction work for highways, roads - II/388 Vir - Rovecne

Czechia, Aug. 10 -- Czechia based STRABAG a.s. has secured contract from Krajska sprava a udrzba silnic Vysociny, prispevkova organizace for Construction work for highways, roads - II/388 Vir - Rovecn... Read More


M/S R-TA Enterprise secures contract for Construction of 35.00 m Bridge from Kagaiya Torab Ali High School to Jalal Memorial High School Via Maulana Bazar road over Curzon Canal at 1200 m Chainage under Laksham Upazila, District Cumilla . [Road ID:419724087] (Remaining Work)

Bangladesh, Aug. 10 -- Bangladesh based M/S R-TA Enterprise has secured contract from Local Government Engineering Department (LGED) for Construction of 35.00 m Bridge from Kagaiya Torab Ali High Scho... Read More


Mir Habibul Alam secures contract for Improvement of Chandai Uoffice at Dasgram Madrasha - Duaria Ha Road (Baraigram Part) at Ch. 2265-4700m & 8000-8500m Under Baraigam Upazila, District: Natore. Road ID: 169153007, Salvage Cost: 4,72,713.00BDT

Bangladesh, Aug. 10 -- Bangladesh based Mir Habibul Alam has secured contract from Local Government Engineering Department (LGED) for Improvement of Chandai Uoffice at Dasgram Madrasha - Duaria Ha Roa... Read More


M/S RAM TRADERS secures contract for Construction of 36 nos Community Toilet (Civil ,Sanitary, Electrical works & Running Water Supply etc) at different Upazila in Pabna District under Rural Sanitation Project of DPHE during the FY 2025-2026.

Bangladesh, Aug. 10 -- Bangladesh based M/S RAM TRADERS has secured contract from Department of Public Health Engineering (DPHE) for Construction of 36 nos Community Toilet (Civil ,Sanitary, Electrica... Read More


Md. Shaharin Haque Malik secures contract for Construction of boundary wall at north side of 62.00 acres of land in Mongla EPZ.

Bangladesh, Aug. 10 -- Bangladesh based Md. Shaharin Haque Malik has secured contract from Bangladesh Export Processing Zones Authority (BEPZA) for Construction of boundary wall at north side of 62.00... Read More


M/S. Chandradwip Construction secures contract for Hessian New Gunnies with 30 kg packing capacity manufactured in the year 2026 or latest. 1. Bag Length: 86.36cm/34 inch, Tolerance: +4cm -0; 2. Bag width: 45.72cm/18 inch, Tolerance: +4cm -0; 3. Bag weight: 330gm/0.73 Pound, Tolerance: +6 percent, -2 percent; 4. Ex-Cloth: 36inch-10.8 oz/36inch (11x12) {WIP (Weight in proportion) 40 inch-12 oz/36 inch (11x12)}; 5. Porter (Ends/dm): 11(47), Tolerance: +2, -2; 6. Shots/Ins (Picks/dm): 12(47), Tolerance: +2, -2; 7. Moisture Regain (MR Percent): Contract 16 percent, Maximum 17 percent; 8. Oil Content: 3 percent Maximum, 9. Sewn: Hemmed Mouth, Herackle Sewn (HKL) Side & Bottom+Safety Sewn; 10. Stitch/dm: Hemming 9-11, Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 lbs 1 Ply, Herackle 9 lbs 3 Ply & Safety 9 lbs 2 Ply; 12. Strength (Kg): a. Cloth breaking load (Strip method 10x20cm): Warp Way- 112 kg (minimum), Weft Way- 120 kg (minimum), b. Seam breaking load (Strip method 5x20cm): Warp Way- 34 kg (minimum), Weft Way- 36 kg (minimum); 13. No. of Bag per Bundle: 25 Pcs, Tolerance: +0, -0; 14. No. of Bundle per Bale: 12 Bundle, Tolerance: +0, -0; 15. No. of Bag per Bale: 300 Pcs, Tolerance: +0, -0; 16. Bale Weight: Net Weight=99 kg, Tolerance: +Acceptable,-0, Tare Weight=3kg, Gross Weight =102 kg; 17. Bale Packing: Flat Packing, Bags Wrap in Clean Jute Cloth and Binded with 2(Two) Iron Belt.(SINGHAJANI LSD, JAMALPUR-2,50,000, ISLAMPUR LSD, JAMALPUR-1,50,000 PCS.).

Bangladesh, Aug. 10 -- Bangladesh based M/S. Chandradwip Construction has secured contract from Directorate General of Food for Hessian New Gunnies with 30 kg packing capacity manufactured in the year... Read More


M/S ROMAN ENTERPRISE secures contract for 1. Construction of RCC Road Start from Lonshing Math Gourango Road to Wasuddin Sardar House. (Ch. 00m-450m), Link-1: Chaiyal Bari Road. (Ch. 00m-110m), Link-2: Sarder Bari Road. (Ch. 00m-120m), at Ward no. 06 & 09, Under Naria Paurashava, District::Shariatpur. Total Length: 680.0m. 1. Construction of RCC Road Start from Lunaria Chaldha main road to Dighirpar Madrasha Road. (Ch. 00m-590m). & Link: Mazhi Bari Road. (Ch. 00m-110m) at Ward no. 07, Under Naria Paurashava, District: Shariatpur. Total Length: 700.0m. (Salvage Tk-58,910.00).

Bangladesh, Aug. 10 -- Bangladesh based M/S ROMAN ENTERPRISE has secured contract from Local Government Engineering Department (LGED) for 1. Construction of RCC Road Start from Lonshing Math Gourango ... Read More


MKL AROHI JV (Joint Venture) secures contract for (a)Improvement of Ali Bazar - Jorkhali Road (Ch. 00m-745m), ID no: 475364075 (b)Improvement of Islampur Bazar - Adarsha Gram - Jorkhali Road (Ch. 00m-770m), ID no: 475364076 (c)Improvement of Nabipur Bazar - HBB Road- Hatia Bazar Road (Ch. 00m-381m) under Hatiya Upazila, District: Noakhali, ID no: 475364077

Bangladesh, Aug. 10 -- Bangladesh based MKL AROHI JV (Joint Venture) has secured contract from Local Government Engineering Department (LGED) for (a)Improvement of Ali Bazar - Jorkhali Road (Ch. 00m-7... Read More