Exclusive

Publication

Byline

Location

Gas Supply to National Grid Begins from Srikail-5 Well

Bangladesh, March 14 -- Gas supply to the national grid from the Srikail-5 well has begun, with an average of around 8 million cubic feet of gas being supplied daily. On Saturday, State Minister for ... Read More


Transmission Line Fault: Two Units Shut at Ashuganj, Power Outages in the Capital

Bangladesh, March 13 -- Two units of the Ashuganj Power Plant in Brahmanbaria have been shut down due to a fault in the national power grid, reducing electricity supply to the grid. At the same time,... Read More