Exclusive

Publication

Byline

JANNAT TRADERS secures contract for a) Construction of Soling Road by The Side daspara Road to dakua Bari Road Word No-09,Under Wazirpur Pourashava. Construction of Soling Road by The Side East Poromansha Shiuli bari Word No,-09, Under Wazirpur Pourashava. b)Construction 0f Palisading Starting from Parman dasha Bridge left Side to Hawaldar bari Site Word No-09 Under Wazirpur Pourashava.

Bangladesh, Aug. 14 -- Bangladesh based JANNAT TRADERS has secured contract from Wazirpur Paurashava for a) Construction of Soling Road by The Side daspara Road to dakua Bari Road Word No-09,Under Waz... Read More


M/S Khan Enterprise & Builders secures contract for Supply and installation of a 10 HP submersible pump motor at the temporary campus of Netrokona Medical College netrokona during FY 2025-26.

Bangladesh, Aug. 14 -- Bangladesh based M/S Khan Enterprise & Builders has secured contract from Public Works Department (PWD) for Supply and installation of a 10 HP submersible pump motor at the temp... Read More


Big Machinery Robert Bednarz secures contract for Construction work - Design and implementation of small retention tasks for the needs of the Jamy Forest District

Poland, Aug. 14 -- Poland based Big Machinery Robert Bednarz has secured contract from Nadlesnictwo Jamy for Construction work - Design and implementation of small retention tasks for the needs of the... Read More


Bizli Enterprise secures contract for (1) Construction of CC Road from Sultanpur Mathpara Habib House to Masuma House (Ch 0.00-28.00) at Ward No-01, Under Mirpur Pourashava, Kushtia. (2) Construction of CC Road from Sultanpure Ashik House to Miraj House (Ch 0.00-28.00) at Ward No-01, Under Mirpur Pourashava, Kushtia. (3) Construction of Brick Wall with RCC Post Palisading at Sultanpur in front Late Biddut House at Ward No-1,under Mirpur Pourashava, Kushtia. Ch 00-25.00m (4) Construction of CC Road from Koripol Monir House to Abdus Sattar House (Ch 0.00-52.00) at Ward No-02, Under Mirpur Pourashava, Kushtia.

Bangladesh, Aug. 14 -- Bangladesh based Bizli Enterprise has secured contract from Mirpur Paurashava for (1) Construction of CC Road from Sultanpur Mathpara Habib House to Masuma House (Ch 0.00-28.00)... Read More


M/S. R K Enterprise secures contract for a.Construction of PVC Pipe drain infrond of Mr.Rony house at Ward No.04 Under Trishal Pourashava. b.Construction of boundary wall of Youth Development Office at Ward No.04 Under Trishal Pourashava. Ch.00-5.5m c.Construction of 2 (two) staircases to access the Model Mosque premises at ward no.04 under Trishal Pourashava d.Construction of slab on drain in front of fish warehouse e.Construction of inspection pit for pipe drain cleaning f.Construction of RCC drain and pipe drain connection work in front of the auditorium at ward No.04 under Trishal Pourashava g.Construction of slab over drain at the gate of Nazrul Auditorium at ward No.04 under Trishal Pourashava h.Construction work of RCC drain and pipe drain connection in front of Nazrul Auditorium Gate Shuktara Sangha i.Construction of a boundary wall for a garbage dump adjacent to Sutia Bridge on the side of the highway at ward No.06 Under Trishal Pourashava j.Repair of drain in front of fish warehouse and wood saw mill k.Construction of pipe drain at Nazrul Academy School Gate l. Cleaning of sewage from pipe drains and raw drains in front of Nazrul Academy and fish market

Bangladesh, Aug. 14 -- Bangladesh based M/S. R K Enterprise has secured contract from Trishal Paurashava for a.Construction of PVC Pipe drain infrond of Mr.Rony house at Ward No.04 Under Trishal Poura... Read More


F R Engineering secures contract for Painting of parking, stair room, repair of ceiling in parking of ground floor, installation of tiles in lift wall in Oporajita building of Eskaton Garden Officers Quarters, Dhaka. FY 2025-26

Bangladesh, Aug. 14 -- Bangladesh based F R Engineering has secured contract from Public Works Department (PWD) for Painting of parking, stair room, repair of ceiling in parking of ground floor, insta... Read More


M/S Nira Enterprise secures contract for (1) Estimate For BFS Road at Nanni Purbapara H/O Sulayman to H/O Liakot word no-03 Under Nanni Union Nalitabari,Dist- Sherpur. (2) Estimate for Construction of 02NoS U-drain Work at (a) Tarani Village Near The H/O Hares Mia (b) Tarani Village Near the H/O Samsul Under Ramchandrakura Union Nalitabar Sherpur.

Bangladesh, Aug. 14 -- Bangladesh based M/S Nira Enterprise has secured contract from Upazila parishad Nalitabari for (1) Estimate For BFS Road at Nanni Purbapara H/O Sulayman to H/O Liakot word no-03... Read More


M/S Tuba Construction secures contract for Supply fitting fixing of 4 nos IPS in Joint District Judges and Senior Civil Judges in Jhalokathi District Judge Court and other electro-mechanical works

Bangladesh, Aug. 14 -- Bangladesh based M/S Tuba Construction has secured contract from Public Works Department (PWD) for Supply fitting fixing of 4 nos IPS in Joint District Judges and Senior Civil J... Read More


Md. Mozibar Rahman secures contract for (1) Construction of CC Road from Titu House to Alomgir house (Ch 0.00-60.00) at Ward No-06, Under Mirpur Pourashava, Kushtia. (2) Construction of CC Road from H/O Sorowar via Rhomot House to H/O Shofi (Ch 0.00-65 .00) at Ward No-07, Under Mirpur Pourashava, Kushtia. (3) Improvement of B F S Road from H/O Kasem to H/O Hobi at Ward no-08 under Mirpur Pourashava, Kushtia. (Ch 00.00-60.00)

Bangladesh, Aug. 14 -- Bangladesh based Md. Mozibar Rahman has secured contract from Mirpur Paurashava for (1) Construction of CC Road from Titu House to Alomgir house (Ch 0.00-60.00) at Ward No-06, U... Read More


MS SHAKI ENTERPRISE secures contract for SD-003: Repairing work of U-brick drain with top slab starting from Bancharampur Molla Bari to T&T Para at T & T Para ward No-04 under Bancharampur Paurashava,Dist: Brahmanbaria (Ch00+00-00+100m),PR-020 : Construction of CC road on Existing SBFS road starting from H/O Jahangir Mulla to H/O Mr.Sabuj Miah at Banchharampur of ward No-04 under Bancharampur Paurashava, Dist: Brahmanbaria (Ch00+00-00+75m)

Bangladesh, Aug. 14 -- Bangladesh based MS SHAKI ENTERPRISE has secured contract from Bancharampur Paurashava for SD-003: Repairing work of U-brick drain with top slab starting from Bancharampur Molla... Read More